An integrated platform for design and numerical analysis of shield tunnelling processes on different levels of detail

Abstract: Building and construction information modelling for decision making during the life cycle of infrastructure projects are vital tools for the analysis of complex, integrated, multidisciplinary systems. The traditional design process is cumbersome and involves significant manual, time-consuming preparation and analysis as well as significant computational resources. To ensure a seamless workflow during the design and analysis and to minimise the computation time, we propose a novel concept of multilevel numerica… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
12
0
1

Year Published

2018
2018
2024
2024

Publication Types

Select...
4
2
1

Relationship

1
6

Authors

Journals

citations
Cited by 32 publications
(13 citation statements)
references
References 24 publications
0
12
0
1
Order By: Relevance
“…The SatBim framework [15] is a comprehensive concept for the integration of multiscale model representations into a BIM. This concentrates particularly on the geomet ricalsemantic modelling of the mechanised shield drive in a form suitable for direct use in numerical simulations.…”
Section: Revit Models and Dynamo Plugins For Lod Approachmentioning
confidence: 99%
See 1 more Smart Citation
“…The SatBim framework [15] is a comprehensive concept for the integration of multiscale model representations into a BIM. This concentrates particularly on the geomet ricalsemantic modelling of the mechanised shield drive in a form suitable for direct use in numerical simulations.…”
Section: Revit Models and Dynamo Plugins For Lod Approachmentioning
confidence: 99%
“…Mit dem SatBimFramework [15] wurde ein umfassendes Konzept zur Einbindung mehrskaliger Modellrepräsenta tionen in ein BIM entwickelt. Hier liegt der Fokus insbe sondere in der geometrischsemantischen Modellierung des maschinellen Schildvortriebs in einer Form, die sich für den direkten Einsatz in numerischen Simulationen eignet.…”
Section: Revit-modelle Und Dynamo-plugins Für Lod-ansatzunclassified
“…have been built to achieve effective data management [3], [4], including automatic data collection, storage and visualization. However, manual analysis falls short of consistent standards and poses risks for tunnel construction.…”
Section: Introductionmentioning
confidence: 99%
“…(3) The performance of TBM is evaluated by ANN models and abnormal conditions can be discovered by comparing the evaluation value with actual value. (4) Improvements have been made to existed DM algorithms based on TBM characteristics to improve performance. (5) The three DM algorithms are not only designed to solve single problems, they are also combined to form a hybrid DM framework to improve data mining process.…”
Section: Introductionmentioning
confidence: 99%
“…The improvement of the applicability based on the information model ensures interoperability throughout the lifecycle phases or information reusability between different application fields using one model. Examples of the effort to improve interoperability using an open data schema to utilize the BIM generated in the design or construction phase are to apply the BIM in the facility management (FM) phase [6,7], or reuse it as a structural analysis model [8][9][10]. In other words, to reuse model data and ensure interoperability between software packages, the use of the information model generated based on the open standard data schema marks the beginning of the process.…”
Section: Introductionmentioning
confidence: 99%