2023
DOI: 10.1108/ecam-06-2022-0534
|View full text |Cite
|
Sign up to set email alerts
|

An integrated risk assessment method for cross-regional mega construction projects

Abstract: PurposeThe purpose of this paper is to develop a novel integrated risk assessment method from the system perspective to evaluate the risk of the cross-regional mega construction project (CMCP). Furthermore, this paper aims to confirm the core risk source factors and refine the risk management strategies of CMCPs through a case study.Design/methodology/approachBased on the analysis of the risk system of CMCPs, the concept model and risk assessment principles of integrated risk assessment were confirmed. The ris… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 64 publications
0
2
0
Order By: Relevance
“…These robust economic and health policies have yielded results in the healthcare sector, including the promotion of inter-regional medical insurance policies and strong support for the construction of national regional medical centers [65,66]. For instance, as of July 2023, China has identified 125 projects for the construction of national regional medical centers in five batches, covering provinces with weak healthcare resources [67]. We are confident that in the future, the unequal distribution of healthcare resources in China will gradually decrease.…”
Section: Discussionmentioning
confidence: 99%
“…These robust economic and health policies have yielded results in the healthcare sector, including the promotion of inter-regional medical insurance policies and strong support for the construction of national regional medical centers [65,66]. For instance, as of July 2023, China has identified 125 projects for the construction of national regional medical centers in five batches, covering provinces with weak healthcare resources [67]. We are confident that in the future, the unequal distribution of healthcare resources in China will gradually decrease.…”
Section: Discussionmentioning
confidence: 99%
“…Optimized management of these interfaces is necessary to ensure that high-speed rail projects (HSRPs) are completed on time with high quality and operated safely (Shen et al ., 2021). However, the complex construction activities and the many stakeholders involved make the interface management of high-speed rail construction projects susceptible to many uncertainties (Xiang et al ., 2023). Risk factors in the interface management process can affect the effectiveness of interface articulation.…”
Section: Introductionmentioning
confidence: 99%