An Integrated Scheduling Algorithm for the Same Equipment Process Sequencing Based on the Root-Subtree Vertical and Horizontal Pre-Scheduling

Abstract: Given the existing integrated scheduling algorithms, all processes are ordered and scheduled overall, and these algorithms ignore the influence of the vertical and horizontal characteristics of the product process tree on the product scheduling effect. This paper presents an integrated scheduling algorithm for the same equipment process sequencing based on the Root-Subtree horizontal and vertical pre-scheduling to solve the above problem. Firstly, the tree decomposition method is used to extract the root node … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
0
0

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(4 citation statements)
references
References 22 publications
0
0
0
Order By: Relevance
“…Refs [34][35][36][37][38][39][40] are all studies on the integrated scheduling problem with machine as the research object. As the latest algorithm, the algorithm (RSVHPSA) in Ref [37] is selected to be compared and analyzed with the proposed algorithm. The experimental results also The scheduling sequence by HIS-PCVM on M 3 is {B19, B13, B11, B6, B9, B4}, and on the general machine, it is {B18, B15, B14, B12, B17, B8, B7, B16, B5, B3, B2, B10, B1}, as shown in Figure 13.…”
Section: Comparison and Analysis Of Symmetric Complex Product Schedulingmentioning
confidence: 99%
See 3 more Smart Citations
“…Refs [34][35][36][37][38][39][40] are all studies on the integrated scheduling problem with machine as the research object. As the latest algorithm, the algorithm (RSVHPSA) in Ref [37] is selected to be compared and analyzed with the proposed algorithm. The experimental results also The scheduling sequence by HIS-PCVM on M 3 is {B19, B13, B11, B6, B9, B4}, and on the general machine, it is {B18, B15, B14, B12, B17, B8, B7, B16, B5, B3, B2, B10, B1}, as shown in Figure 13.…”
Section: Comparison and Analysis Of Symmetric Complex Product Schedulingmentioning
confidence: 99%
“…Refs [34][35][36][37][38][39][40] are all studies on the integrated scheduling problem with machine as the research object. As the latest algorithm, the algorithm (RSVHPSA) in Ref [37] is selected to be compared and analyzed with the proposed algorithm. The experimental results also show the superiority of HIS-PCVM.…”
Section: Comparison and Analysis Of Symmetric Complex Product Schedulingmentioning
confidence: 99%
See 2 more Smart Citations