2020
DOI: 10.1007/s10845-020-01675-x
|View full text |Cite
|
Sign up to set email alerts
|

An integrated SMED-fuzzy FMEA model for reducing setup time

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
22
0
1

Year Published

2021
2021
2024
2024

Publication Types

Select...
4
3
1

Relationship

0
8

Authors

Journals

citations
Cited by 21 publications
(23 citation statements)
references
References 22 publications
0
22
0
1
Order By: Relevance
“…Braglia et al [13] suggest the integration of SMED with the 5-Whys Analysis, which allows to highlight sub-optimum conditions in the changeover process, reducing costs and the effort necessary to conduct the SMED program. Yazıcı et al [14] propose the SMED-fuzzy FMEA to prevent problems causing the extending of the setup time. Azizi and Manoharan [15] designed an efficient VSM (Value Stream Mapping), to improve the productivity of Small and Medium Enterprises.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…Braglia et al [13] suggest the integration of SMED with the 5-Whys Analysis, which allows to highlight sub-optimum conditions in the changeover process, reducing costs and the effort necessary to conduct the SMED program. Yazıcı et al [14] propose the SMED-fuzzy FMEA to prevent problems causing the extending of the setup time. Azizi and Manoharan [15] designed an efficient VSM (Value Stream Mapping), to improve the productivity of Small and Medium Enterprises.…”
Section: Literature Reviewmentioning
confidence: 99%
“…noticed how there was a subset of workers who were in charge of most changeovers (see operators 1, 7, 8, 9 and 10), while a small subgroup was totally devolved to production only (see operator 2, 4, 13). The remaining workers (namely operator 3,5,6,11,12,14) were hybrid figures who could be involved either in simple setups (e.g., "Basic" or "Hinge Change" type) or in production, with different efficiency (see the green line of production quantity). Similar patterns were recognized across different weekly periods and shifts.…”
Section: Applying Phase Imentioning
confidence: 99%
“…This paper showed 57% of mold change time reduction, from 175.9 to 79 minutes, by SMED implementation. On th e other hand, studies performed in similar industries showed a range of 48% to 60% set-up time improvement [18][19][20] [21]. As showed by Yazıcı, Hatice and Boran in which they concluded on an approximate time of 71.32 to 36.97 minutes reduction for an injection molding machine's preparation time [21].…”
Section: A Scenario Vs Outcomesmentioning
confidence: 98%
“…On th e other hand, studies performed in similar industries showed a range of 48% to 60% set-up time improvement [18][19][20] [21]. As showed by Yazıcı, Hatice and Boran in which they concluded on an approximate time of 71.32 to 36.97 minutes reduction for an injection molding machine's preparation time [21]. This investigation is consequent wit h their findings and the other three studies above, thus the validity of the obtained set-up time results is evident.…”
Section: A Scenario Vs Outcomesmentioning
confidence: 99%
“…Salah satu masalah terbesar di industri automotive adalah pergantian mould, Metode SMED dan 5S dapat menurunkan waktu setup eksternal sebesar 11% (Pinto et al, 2019). Mengintegrasikan metode SMED dengan analisis fuzzy-FMEA dapat mengurangi waktu setup pada produksi plastik injection (Yazıcı et al, 2020). SMED dapat berfungsi mengurangi 6 kerugian utama pada mesin moulding injection sehingga dapat mengurangi waktu setup dan meningkatkan produktivitas sehingga OEE meningkat (Bhade & Hegde, 2020).…”
Section: Pendahuluanunclassified