2013 American Control Conference 2013
DOI: 10.1109/acc.2013.6580467
|View full text |Cite
|
Sign up to set email alerts
|

An LPV discrete-time controller for the rejection of harmonic time-varying disturbances in a lightweight flexible structure

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2013
2013
2021
2021

Publication Types

Select...
5
2

Relationship

2
5

Authors

Journals

citations
Cited by 9 publications
(7 citation statements)
references
References 13 publications
0
7
0
Order By: Relevance
“…9 Authors' note: Defence Evaluation and Research Agency. [108], [113], [117], [120], [122], [123], [143], aerospace flight control [145], and computer sciences [96].…”
Section: A History and Range Of Applicationsmentioning
confidence: 99%
See 1 more Smart Citation
“…9 Authors' note: Defence Evaluation and Research Agency. [108], [113], [117], [120], [122], [123], [143], aerospace flight control [145], and computer sciences [96].…”
Section: A History and Range Of Applicationsmentioning
confidence: 99%
“…More recently, the application of LPV techniques in robotics has been considered, both as an example on which to validate methods to handle LPV models of high complexity experimentally [27], [54], [118], [144], as well as with explicit industrial grade control objectives in mind [61], [62]. In the field of active noise cancellation headsets and vibration control the LFT approach as per [15] is also followed [113], [139]- [143].…”
Section: A History and Range Of Applicationsmentioning
confidence: 99%
“…The model is truncated in the second mode, because in experimental studies [8,9,16,17] where system identification for cantilevered beams was performed, just the first two modes of vibration have considerable amplitude. The mode shape functions are assumed to have the form 1 1 ,…”
Section: Modelingmentioning
confidence: 99%
“…It might affect the disturbance attenuation for fast changes in the disturbance frequency, although this simplifi ed model has been used for the rejection of time-varying frequencies (Shu et al 2011, Ballesteros and Bohn 2011a, 2011b, Heins et al 2011, 2012a, 2012b, Duarte et al 2013. In most practical applications with time--varying frequencies, however, the measured frequency will not correspond exactly to the instantaneous frequency due to measurement delays and the transmission of the disturbance to the plant.…”
Section: Disturbance Modelmentioning
confidence: 99%
“…Dettori and Scherer (2001), Du et al (2003), Bohn (2011a, 2011b), Shu et al (2011) and Duarte et al (2012Duarte et al ( , 2013 employed gain-scheduling output-feedback controllers. In the work done by Heins et al (2011Heins et al ( , 2012aHeins et al ( , 2012b and Ballesteros et al (2012) gain--scheduling observer-based controllers were implemented.…”
Section: Rejection Of Harmonic and Transient Disturbances Of A Smart mentioning
confidence: 99%