Abstract:The economic operation of an electric power system over a short time horizon involves two separate steps. The first of these is the predispatch or selection of equipment to be operated to meet the expected loads at each point in time of the horizon (unit commitment). The second step is the on-line economic dispatch which determines, instant to instant, the load to be carried on each unit selected in the first step. The unit commitment problem is usually solved by mixed integer programming and the economic dispatch problem by an incremental cost method. In this paper stochastic programming models for the unit commitment and economic dispatch problems are presented.
EinfiihrungDie Lastverteilung in einem Kraftwerksverbund erfolgt in zwei Schritten. Im ersten Schritt werden die Kraftwerkseinheiten ausgew/ihlt, die zu jedem Zeitpunkt des Planungszeitraumes in Betrieb sind, damit die erwartete Energieanforderung (Last) erftillt werden kann. Bei dieser Entscheidung mtissen u.a. die Kosten beriicksichtigt werden, die durch An-und Abfahren der verschiedenen Dampfturbinen verursacht werden. Dieses Problem wird als Einsatzoptimierung bezeichnet, w/ihrend im zweiten Schritt eine Belastungsoptimierung durchgef'tihrt wird. In dieser Optimierung wird die Last, die in einem bestimmten Zeitpunkt tats~ichlich anf~illt, auf die in Betrieb befindlichen Kraftwerkseinheiten unter BeriJcksichtigung der verschiedenen Wirkungsgrade der Einheiten verteilt. 1) Dr. RolfWiebking, Parkstr. 24, 5210 Ttoisdorf.