2012
DOI: 10.1016/j.sbspro.2012.09.770
|View full text |Cite
|
Sign up to set email alerts
|

An Optimization Procedure to Design a Minibus Feeder Service: An Application to the Sintra Rail Line

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2014
2014
2022
2022

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 8 publications
(5 citation statements)
references
References 13 publications
0
5
0
Order By: Relevance
“…An effective solution can be achieved by 1) vertical urban development (Wahyudi, 2018), and 2) feeder reformation based on the demand-responsive connection (DRC) approach (Costa et al, 2021;Martínez and Eiró, 2012). An overview of DRC research is shown in Table 1.…”
Section: Feeder Functionmentioning
confidence: 99%
“…An effective solution can be achieved by 1) vertical urban development (Wahyudi, 2018), and 2) feeder reformation based on the demand-responsive connection (DRC) approach (Costa et al, 2021;Martínez and Eiró, 2012). An overview of DRC research is shown in Table 1.…”
Section: Feeder Functionmentioning
confidence: 99%
“…Using the GeoMedia software you can determine the length of an entity drawn in a class that can be done automatically due to the georeferencing of the image according to the previously chosen coordinate points. [10] Thus, the distance of a route was automatically calculated (measured) by accessing the "update attributes" function from the "Edit" menu, introducing a length operator inside the corresponding attribute. The automatic measurement of the desired route length on the map resulted.…”
Section: Calculation Of Framing Path Lengthsmentioning
confidence: 99%
“…In other words, transit route was predetermined without optimization. Hence, enhanced methods were proposed which optimize transit route together with aforementioned factors [16][17][18][19]. Although the methods have been enhanced, there are still problems: (1) the access cost from real origin (e.g., home or school) to its corresponding feeder bus stop was ignored when assuming that demands are centered on feeder bus stops (nodes) [17,18,[20][21][22][23][24]; (2) locations of feeder bus stops are fixed [25,26]; (3) feeder buses must reach all predetermined stops without considering real-time demand information [11,18,27].…”
Section: Literature Reviewmentioning
confidence: 99%