Análisis de los cambios en las propiedades mecánicas de materiales de subrasante por la adición de materiales poliméricos reciclados

Abstract: Introducción: este artículo es producto de la investigación “Análisis de la resistencia y durabilidad de un suelo de cemento adicionando material no biodegradable polietileno malla Raschel (polisombra) reciclada en diferentes porcentajes en relación con el peso del suelo”, desarrollada en la Universidad de la Salle durante el 2016. Problema: identificación de las variaciones en las propiedades mecánicas de materiales de subrasante por la adición de materiales poliméricos. Objetivo: recopilar las principales in… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 17 publications
0
1
0
Order By: Relevance
“…For a flat surface, this means more 26.5m 2 to build this, as can be seen in Figure 6. Finally, four 0.5-meter Zinc Threaded Rods of 3/8 inch were selected for the blades of the dustbin and for the soil an underlayment plate with bait filler is necessary to support the weight of the waste and avoid the soil sinking; other more environmentally sustainable materials can also be considered [37]. In this way, in Table IV, the initial project cost can be seen to be $18´194.515 COP.…”
Section: Source: Own Workmentioning
confidence: 99%
“…For a flat surface, this means more 26.5m 2 to build this, as can be seen in Figure 6. Finally, four 0.5-meter Zinc Threaded Rods of 3/8 inch were selected for the blades of the dustbin and for the soil an underlayment plate with bait filler is necessary to support the weight of the waste and avoid the soil sinking; other more environmentally sustainable materials can also be considered [37]. In this way, in Table IV, the initial project cost can be seen to be $18´194.515 COP.…”
Section: Source: Own Workmentioning
confidence: 99%