2022
DOI: 10.26623/teknika.v17i1.4823
|View full text |Cite
|
Sign up to set email alerts
|

Analisis Struktur Slab on Pile Studi Kasus Jalan Tol Semarang – Demak Seksi 2

Abstract: <strong><em>Slab on pile is one of the bridge structures used in the Semarang Demak Toll Road Project Section 2. The slab on pile structure consists of a slab, pile head, and piles. There are 2 (two) typical slab on pile bridges at this location, which are distinguished by the number and distance of the piles. 5 (five) piles in 1 (one) pile head with a spacing of 3.5 meters are used for piles with a freestanding of less than 6 meters. This pile configuration is located at STA 19 +658 to 19+793. Mea… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles