Analisis Variabel-Variabel Risiko pada Pelaksanaan Proyek Konstruksi Jalan

Abstract: This research aims to identify the risk variables that ever occurred while executing of road construction project. In addition, it is to identify how significant and how big the influence of risk variables to the articulation of project execution processes of a road construction project, based on questionnaire that distributed to 30 questionnaires who are project managers and site managers on contractors of road construction project.  From the research data, there were identified 14 risk variables with 84 risk… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0
1

Year Published

2022
2022
2022
2022

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 0 publications
0
1
0
1
Order By: Relevance
“…Sebelum data dianalisis menggunakan metode RRI dan Korelasi terlebih dahulu data diuji realibility untuk mengetahui keandalan dan konsitensi pertanyaan yang ada dalam kuesioner. Adapun Rumus perhitungan untuk menentukan peringkat/perangkingan risiko adalah [12][13]: Gambar 3. Pengalaman kerja…”
Section: Metode Penelitianunclassified
“…Sebelum data dianalisis menggunakan metode RRI dan Korelasi terlebih dahulu data diuji realibility untuk mengetahui keandalan dan konsitensi pertanyaan yang ada dalam kuesioner. Adapun Rumus perhitungan untuk menentukan peringkat/perangkingan risiko adalah [12][13]: Gambar 3. Pengalaman kerja…”
Section: Metode Penelitianunclassified
“…[6] describes the highest number of risks originate from project activities, which indicates that the risks, especially at the implementation stage, arise more because the technical work in the field is very close to the environment around the project and all its activities. The risk variable that has the most influence on the implementation of road construction projects, which are the top three average values (mean) in the results of the analysis of this study, is the contractual risk variable, with the sub-variable being unilateral termination by the owner if the contractor does not carry out the obligations according to the contract; technical risk variable with sub-variable of material availability that arrived in the field different from that ordered; natural/natural risk variable with erratic weather sub variable based on [7].…”
Section: Introductionmentioning
confidence: 99%