2021
DOI: 10.1016/j.tust.2021.104063
|View full text |Cite
|
Sign up to set email alerts
|

Analysis and application of friction calculation model for long-distance rock pipe jacking engineering

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
8
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 29 publications
(8 citation statements)
references
References 32 publications
0
8
0
Order By: Relevance
“…The understanding of the rock parameters and geological conditions is beneficial for decreasing the potential for geo-hazards during engineering [25,28,[33][34][35][36]. The physical and mechanical parameters of the rock and soil were tested by collecting soil and rock from the slope of the open pit, making standard soil and rock specimens, using a straight shear meter, a rock shear resistance meter, and a triaxial shear tester.…”
Section: Testing Of Geotechnical and Physical Properties In The Study...mentioning
confidence: 99%
“…The understanding of the rock parameters and geological conditions is beneficial for decreasing the potential for geo-hazards during engineering [25,28,[33][34][35][36]. The physical and mechanical parameters of the rock and soil were tested by collecting soil and rock from the slope of the open pit, making standard soil and rock specimens, using a straight shear meter, a rock shear resistance meter, and a triaxial shear tester.…”
Section: Testing Of Geotechnical and Physical Properties In The Study...mentioning
confidence: 99%
“…Many pipe jacking engineering practices show that if the pipe-soil frictional resistance is too large, it may cause the engineering accidents such as jacking difficulty, pipe section cracking, the back support wall of launching shaft damage, etc. [1][2][3][4][5][6][7][8][9][10][11][12][13]21] Thus, there are two key aspects to ensure the smooth implementation of trenchless pipe jacking operation as follow: (1) How to accurately estimate the jacking force for the construction design of pipe jacking operation? Currently, the main estimation methods of jacking force include theoretical analysis, experimental test, theoretical calculation equations, empirical estimation equations, and field monitoring, etc.…”
Section: Introductionmentioning
confidence: 99%
“…Currently, the main estimation methods of jacking force include theoretical analysis, experimental test, theoretical calculation equations, empirical estimation equations, and field monitoring, etc. However, each estimation method has its own applicable conditions and limitations, it is difficult to provide a general guidance for pipe jacking engineering practice [1][2][3][4][5][10][11][12][13][14][15][16][17][18][19]. (2) How to effectively reduce the pipe-soil frictional resistance during pipe jacking process?…”
Section: Introductionmentioning
confidence: 99%
“…Pipe jacking has widely been used as trenchless pipeline construction technology within the field of oil and gas transmission, hydraulic engineering, and municipal sewage pipelines, among other. [1][2][3] Nowadays, the development trend of pipe jacking engineering is characterized by longer pipeline, more complex strata and larger pipe diameter and, consequently, more demanding technical performance of jacking pipes are required. [4][5][6] Traditional reinforced concrete pipe (RCP) are frequently used, this being prone to crack during the installation (due to the thrust of the boring machine) and/or during service condition, this leading to jeopardize the durability of the pipeline.…”
Section: Introductionmentioning
confidence: 99%
“…Pipe jacking has widely been used as trenchless pipeline construction technology within the field of oil and gas transmission, hydraulic engineering, and municipal sewage pipelines, among other 1–3 . Nowadays, the development trend of pipe jacking engineering is characterized by longer pipeline, more complex strata and larger pipe diameter and, consequently, more demanding technical performance of jacking pipes are required 4–6 .…”
Section: Introductionmentioning
confidence: 99%