2018
DOI: 10.1051/e3sconf/20183804010
|View full text |Cite
|
Sign up to set email alerts
|

Analysis and Assessment of Operation Risk for Hybrid AC/DC Power System based on the Monte Carlo Method

Abstract: Based on the Monte Carlo method, an improved risk assessment method for hybrid AC/DC power system with VSC station considering the operation status of generators, converter stations, AC lines and DC lines is proposed. According to the sequential AC/DC power flow algorithm, node voltage and line active power are solved, and then the operation risk indices of node voltage over-limit and line active power over-limit are calculated. Finally, an improved two-area IEEE RTS-96 system is taken as a case to analyze and… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 2 publications
(1 reference statement)
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?