2022
DOI: 10.1088/1755-1315/1101/7/072009
|View full text |Cite
|
Sign up to set email alerts
|

Analysis and Identification of Building Construction Accident Risk in China basing Exclusively Database

Abstract: In order to reduce the number of building construction accidents (BCA) and ensure construction activities safety, investigators analyzed BCA in China with recent representative 10 year data. Firstly, the investigators collected BCA information in the research period, determined accident trend and pattern in various dimensions. The development of safety management strategies for tower crane accidents (TCA) and collapse accidents (CA) was essential for construction safety control. Secondly, the investigators col… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 23 publications
0
1
0
Order By: Relevance
“…In construction process field, 20 out of 61 observations were made regarding the construction of buildings, dams, roads, and tunnels. Within this field, the 60 out of 202 observations covered topics such as construction delays [22], crane, drilling and excavation tasks [14,18,24,39,48,70,74]; geological conditions [54], scaffolding collapse [68]; transport delays [31]; tunnelling [28,36,37,41,43,55,67]; workers and machinery location [34,40]. According to Erzaij et al [22], project suspensions are among the most persistent tasks facing the construction sector, due to the difficulty of the industry and the essential interdependence between the bases of delay risk.…”
Section: Discussion and Future Directionsmentioning
confidence: 99%
“…In construction process field, 20 out of 61 observations were made regarding the construction of buildings, dams, roads, and tunnels. Within this field, the 60 out of 202 observations covered topics such as construction delays [22], crane, drilling and excavation tasks [14,18,24,39,48,70,74]; geological conditions [54], scaffolding collapse [68]; transport delays [31]; tunnelling [28,36,37,41,43,55,67]; workers and machinery location [34,40]. According to Erzaij et al [22], project suspensions are among the most persistent tasks facing the construction sector, due to the difficulty of the industry and the essential interdependence between the bases of delay risk.…”
Section: Discussion and Future Directionsmentioning
confidence: 99%