2012
DOI: 10.1080/15623599.2012.10773191
|View full text |Cite
|
Sign up to set email alerts
|

Analysis of Contractors Performance in Gaza Strip Construction Projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
7
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(8 citation statements)
references
References 0 publications
1
7
0
Order By: Relevance
“…B. H. [54][55][56][57][58], Abdul-Rahman, H. [55,57,59,60], and Enshassi, A. [61][62][63][64][65][66][67][68][69]. This shows that, among a large set of scholars investigating delay in construction, only a limited number of authors are regularly co-authoring in the delay area.…”
Section: Bibliography Analysismentioning
confidence: 92%
“…B. H. [54][55][56][57][58], Abdul-Rahman, H. [55,57,59,60], and Enshassi, A. [61][62][63][64][65][66][67][68][69]. This shows that, among a large set of scholars investigating delay in construction, only a limited number of authors are regularly co-authoring in the delay area.…”
Section: Bibliography Analysismentioning
confidence: 92%
“…Lastly, conflict and incomplete information is the fourth significant cause of rework in this study (mean 4.24). Incomplete information at the design stage was ranked as the second cause of rework in the study of rework impacts on the performance of construction projects (Enshassi et al , 2017). Furthermore, Conflict and inaccuracy of information ranked fifth in rework causes in the study of building construction projects in Nigeria (Aiyetan, 2013).…”
Section: Discussionmentioning
confidence: 99%
“…Content analysis of the last 35 papers falls into five groups consisting of 37 rework causes that are reported in the result section. The five groups of rework causes are based on the classification methods used in the previous studies (Josephson et al , 2002; Oyewobi and Ogunsemi, 2010; Zhang et al , 2012; Enshassi et al , 2017).…”
Section: Methodsmentioning
confidence: 99%
“…Quality performance of any project is one of the measures of project success. The quality of design also includes the level of different features of the facilities that satisfy the need and within the budget of clients (Enshassi et al, 2012;Storbacka et al, 1994). Project design is the traditional method of procurement planning of PHC facilities viewed the quality of design and construction as the most important factors influencing vfm (Dikmen et al, 2005;Philips-Ryder et al, 2013;Poll, 2007).…”
Section: Quality Performance Of Phc Building Facilitiesmentioning
confidence: 99%