Analysis of delays in Tanzanian construction industry

Abstract: Purpose The purpose of this paper is twofold: first, to develop theoretical underpinnings using TCE, and second, to run the analysis using an advanced tool such as structural equation modeling (SEM). Design/methodology/approach This study was conducted in the construction industry in Tanzania. A questionnaire-based survey method was used. A total of 308 respondents participated in the study. The relationships between the cause and effect factors were analyzed using SEM. Findings The important findings are … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
34
0
2

Year Published

2018
2018
2024
2024

Publication Types

Select...
5
3

Relationship

1
7

Authors

Journals

citations
Cited by 83 publications
(36 citation statements)
references
References 37 publications
0
34
0
2
Order By: Relevance
“…Any rise in transaction costs along the project's life cycle without proper mitigation management would lead to cost overruns. Sambasivan et al (2017) revealed the delay influencing factors in construction project activities holding the main role as transaction partners when dealing with time and cost overrun. Therefore, a collective of studies on delay issues has been collected and summarized in Table 1 to understand its causes and effects.…”
Section: Delay Factorsmentioning
confidence: 99%
See 2 more Smart Citations
“…Any rise in transaction costs along the project's life cycle without proper mitigation management would lead to cost overruns. Sambasivan et al (2017) revealed the delay influencing factors in construction project activities holding the main role as transaction partners when dealing with time and cost overrun. Therefore, a collective of studies on delay issues has been collected and summarized in Table 1 to understand its causes and effects.…”
Section: Delay Factorsmentioning
confidence: 99%
“…Moreover, external or environmental factors also influence the performance of a project and making it difficult for the construction managers to complete their project on time and within the stipulated cost. Basically, Sambasivan et al (2017) revealed that the causes of delay are actually the outcomes of uncertainties (i.e. poor governance structure, weather, acts of nature, improper tool or techniques selection for time and cost estimation), bounded rationality (i.e.…”
Section: Delay Factorsmentioning
confidence: 99%
See 1 more Smart Citation
“…Meanwhile, the construction industry has been reported as one of the dangerous industries due to poor safety performance [4,5]. In addition, delays and cost overruns are very common in construction projects [6,7]. As a result, a number of initiatives have been introduced to minimize the negative environmental impacts of construction activities, e.g., waste, emissions, and to improve the safety, time, and cost performance.…”
Section: Introductionmentioning
confidence: 99%
“…Therefore, transaction cost economics (TCE) is mainly concerned with alternative institutional arrangements, particularly aligning governance structures with transactions [28]. TCE has been widely applied in buyer-supplier relationships in industrial marketing, management, and strategic business research [8,[29][30][31]. In agrifood chains, TCE has been presented by Sporleder [32], Henderson [33], Schulze and Spiller [34], Banterle and Stranieri [35], and most recently by Wever and Wognum [36] and Kilelu and Klerkx [37], in the context of chain management [38,39].…”
Section: Introductionmentioning
confidence: 99%