2017
DOI: 10.1016/j.ress.2017.05.040
|View full text |Cite
|
Sign up to set email alerts
|

Analysis of extended warranties for medical equipment: A Stackelberg game model using priority queues

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
9
0

Year Published

2017
2017
2025
2025

Publication Types

Select...
8

Relationship

1
7

Authors

Journals

citations
Cited by 19 publications
(9 citation statements)
references
References 34 publications
0
9
0
Order By: Relevance
“…Then, they are fairly influenced by the repair assumption. For instance, by considering imperfect repair ( 0 1 q ≤≤ ), it is expected that devices with the same shape β 1 β > and scale α 0 α > fail less frequently than in the context presented by Moura et al [23], who considered minimal repairs. Thus, the change in repair hypothesis can modify the expected payoffs, and consequently a change of strategies.…”
Section: Hospital's Optimal Strategymentioning
confidence: 99%
See 2 more Smart Citations
“…Then, they are fairly influenced by the repair assumption. For instance, by considering imperfect repair ( 0 1 q ≤≤ ), it is expected that devices with the same shape β 1 β > and scale α 0 α > fail less frequently than in the context presented by Moura et al [23], who considered minimal repairs. Thus, the change in repair hypothesis can modify the expected payoffs, and consequently a change of strategies.…”
Section: Hospital's Optimal Strategymentioning
confidence: 99%
“…Quantitative studies about warranty, maintenance outsourcing and maintenance contracts are present by Kim et al [18], Bouguerra et al [3], Husniah et al [14], Huang et al [13], Moura et al [23] and Darghouth et al [6]. However, such studies have simplifying assumptions with respect to the state of the system after a corrective maintenance (CM) intervention.…”
Section: Science and Technologymentioning
confidence: 99%
See 1 more Smart Citation
“…With help of a contrast agent, doctors can visualize blood vessels and blood flow [38,39]. The times between failures (in days) of the considered angiograph are in Table 1 (to be read across the row).…”
Section: Data Set #1: Angiographmentioning
confidence: 99%
“…As preventive maintenance can prolong product life, reduce warranty cost and retain consumer loyalty, [8]proposed a customised 2D extended warranty strategy for consumers with different usage rate. Some studies have also focused on supply chain coordination issues related to extended warranty (Mai et al 2017[15]; Moura et al 2017 [16]; Qin et al 2017 [21]).…”
Section: Introductionmentioning
confidence: 99%