2023
DOI: 10.56028/aetr.5.1.15.2023
|View full text |Cite
|
Sign up to set email alerts
|

Analysis of instantaneous surface settlement during tunnel construction in composite stratum

Abstract: It is important for shield tunnelling safety to predict and control the instantaneous surface settlement. Particularly, the complex geological condition can make accurate prediction more difficult. To adapt to the stratum distribution, a semi-analytical method is established by introducing the finite layer method into tunnel mechanical analysis. Firstly, based on the elastic solution of the finite layer method, the horizontal flexibility coefficient of tunnelling and the surface settlement are obtained by appl… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 1 publication
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?