2012
DOI: 10.1016/j.fusengdes.2012.01.015
|View full text |Cite
|
Sign up to set email alerts
|

Analysis of ITER upper port plug remote handling maintenance scenarios

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2013
2013
2014
2014

Publication Types

Select...
5

Relationship

1
4

Authors

Journals

citations
Cited by 9 publications
(5 citation statements)
references
References 6 publications
0
5
0
Order By: Relevance
“…Availability considerations lead to the need for efficient maintenance solutions, usually by remote handling [10]. Two mainly independent approaches can be defined; on one side the general reliability of tools and processes can be optimized, on the other side the reduction of amount and complexity of the required remote handling tasks leads to faster and more reliable maintenance operations.…”
Section: In Vessel Part Of the Upper Launchermentioning
confidence: 99%
“…Availability considerations lead to the need for efficient maintenance solutions, usually by remote handling [10]. Two mainly independent approaches can be defined; on one side the general reliability of tools and processes can be optimized, on the other side the reduction of amount and complexity of the required remote handling tasks leads to faster and more reliable maintenance operations.…”
Section: In Vessel Part Of the Upper Launchermentioning
confidence: 99%
“…However, research into a synthetic viewing system is being undertaken [8], employing cameras to geometrically calibrate a virtual scene to a real hardware setup [2].…”
Section: Modules Irrelevant To Rhscmentioning
confidence: 99%
“…ITER has established procedures to develop validated RH designs and methods [1] [2]. This implies that the accessibility and handle-ability of an ITER component by remote methods, needs to be reviewed.…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations