“…While a few studies also investigated economic aspects in more detail [9,[11][12][13], the others did not examine costs closely [6,7], or costs were not part of their research [4,5,8,10]. Only the study of Bodner et al [11] considered the technology readiness level (TRL) as a measure to evaluate the corresponding systems. To take economic and practical questions into account, this study determines the LCOE and the TRL in addition to the round-trip efficiency for each promising configuration.…”