Mediterranean Conference on Power Generation, Transmission, Distribution and Energy Conversion (MEDPOWER 2018) 2018
DOI: 10.1049/cp.2018.1863
|View full text |Cite
|
Sign up to set email alerts
|

Analysis of Possibilities of Alleviating Repercussions Caused by Large Disturbances in the Power System

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…A number of AS have strict latency and liveness requirements on the data exchange of DRES with centralized and sometimes cloud-based optimization processes such as to prevent the complete grid system from collapsing [1]. Increased network latency and jitter can result in a ripple effect on the grid system and may eventually lead to blackouts or brownouts [2]. Hence, DRES integration poses an important real-time control and management challenge on the communication layer.…”
Section: Introductionmentioning
confidence: 99%
“…A number of AS have strict latency and liveness requirements on the data exchange of DRES with centralized and sometimes cloud-based optimization processes such as to prevent the complete grid system from collapsing [1]. Increased network latency and jitter can result in a ripple effect on the grid system and may eventually lead to blackouts or brownouts [2]. Hence, DRES integration poses an important real-time control and management challenge on the communication layer.…”
Section: Introductionmentioning
confidence: 99%