Analysis of Prestressed Precast Concrete Pavement

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
7
0
1

Year Published

2018
2018
2023
2023

Publication Types

Select...
6
1
1

Relationship

1
7

Authors

Journals

citations
Cited by 10 publications
(8 citation statements)
references
References 4 publications
0
7
0
1
Order By: Relevance
“…The size of the precast concrete slab is relatively low. For instance, the panel size in the study by Syed and Sonparote was 3.5 × 4.5 m, and that in the study by Qu et al was 1.5 × 1.5 m [16,18]. Special designs may be needed at the joints to help the load transfer of neighboring slabs.…”
Section: Introductionmentioning
confidence: 96%
See 2 more Smart Citations
“…The size of the precast concrete slab is relatively low. For instance, the panel size in the study by Syed and Sonparote was 3.5 × 4.5 m, and that in the study by Qu et al was 1.5 × 1.5 m [16,18]. Special designs may be needed at the joints to help the load transfer of neighboring slabs.…”
Section: Introductionmentioning
confidence: 96%
“…Different tensioning methods have been reported in existing literatures. Transverse prestressing was applied on concrete slabs in the study by Syed and Sonparote [16]. A transverse pre-tensioning was applied during the concrete slab fabrication and a longitudinal post-tensioning was applied after the installation on the road [17].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…The finished panels should be transported to the site with the help of a wide bed trolley and placed over a perfectly prepared levelling course (Tayabji & Wouter, 2015). PCP allows us to construct or repair a concrete pavement in a limited time, which helps reduce the accidental risks related to traffic congestion (Chen & Chang, 2015;Syed & Sonparote, 2017). Based upon the traffic data collected by Missouri Department of Transport (DOT), the user costs incurred due to extended lane closure are reduced by 25% in case of application of PCP, as it requires the lane to be closed only for limited non-traffic durations (Gopalaratnam, Donahue, Davis, & Dailey, 2006).…”
Section: Introductionmentioning
confidence: 99%
“…The time of lane or road section closure depends on the pavement type and damage severity. For example, 1 km length of concrete pavement in 7.5 m width is constructed and opened to traffic after minimum 94 days (Syed & Sonparote, 2017). While, asphalt pavement is ready to take traffic immediately after construction since curing is not needed unlike concrete pavement.…”
Section: Introductionmentioning
confidence: 99%