Analysis of short-term operational forecast deviations and controllability of utility-scale photovoltaic plants

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
1
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(2 citation statements)
references
References 20 publications
0
1
0
Order By: Relevance
“…However, there remain two major issues when integrating it into the power grid due to the consequent intermittent and fluctuating features (Chao, 2011;Kim et al, 2020). In addition, the grid dispatching center uses the forecasting power of the PV power station as reference for scheduling plan, but there is still a large deviation between forecasting power and actual generation (Keeratimahat et al, 2021), which may not only cause the occurrence of PV curtailment (Bird et al, 2016;Zhang et al, 2022a) but also result in low system reliability and security due to inadequate backup resources. Furthermore, it is possible to face high penalty for PV power station (Azimov and Avezova, 2022).…”
Section: Introductionmentioning
confidence: 99%
“…However, there remain two major issues when integrating it into the power grid due to the consequent intermittent and fluctuating features (Chao, 2011;Kim et al, 2020). In addition, the grid dispatching center uses the forecasting power of the PV power station as reference for scheduling plan, but there is still a large deviation between forecasting power and actual generation (Keeratimahat et al, 2021), which may not only cause the occurrence of PV curtailment (Bird et al, 2016;Zhang et al, 2022a) but also result in low system reliability and security due to inadequate backup resources. Furthermore, it is possible to face high penalty for PV power station (Azimov and Avezova, 2022).…”
Section: Introductionmentioning
confidence: 99%
“…The Australian National Energy Market (NEM) requires utility wind and solar generators to predict dispatch targets at 5-min intervals to regulate short-term demand-supply volatility in the operational market [44]. Generating forecasts at 5-min intervals can be challenging since forecasts have to be optimized for performance in real-time at very short-time scales.…”
Section: Introductionmentioning
confidence: 99%