“…There is no advance control method applicable to the design stage, so it can no longer meet the requirements of newly subway safety management. In addition, the current risk identification process is still through 2D drawings and the design scope considered in the current design specifications are far from being able to cover all kinds of safety problems in the construction and operation phases (such as the safety of employees during construction (Xia et al, 2020;Zhou & Guo, 2020), the safety of staff and passengers during normal operation (Danfeng & Jing, 2019;Shin, 2020), the safety of public evacuation of large passenger flow under emergencies (Chen et al, 2020;Chen, 2020;Cheng et al, 2020;Li et al, 2017, etc. ), lack of visually risk identification and quantification methods, can no longer meet the increasingly complex needs of projects.…”