2022
DOI: 10.1007/s00500-022-07386-0
|View full text |Cite
|
Sign up to set email alerts
|

Analysis of the difference between footprints of uncertainty for interval type-2 fuzzy PI controllers

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2023
2023
2025
2025

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 33 publications
0
4
0
Order By: Relevance
“…To simulate ARL, SDRL and RL percentiles of IT2TFN X and R control charts, sample size n = 5, process mean 0.0 and standard deviation 1.0 were selected. L 1 = L 2 = 0.05 and FOU = 0.30 were used in the fuzzification process according to experts, as they provide a fast response while at the same time reducing overshoots according to [18].…”
Section: Resultsmentioning
confidence: 99%
See 3 more Smart Citations
“…To simulate ARL, SDRL and RL percentiles of IT2TFN X and R control charts, sample size n = 5, process mean 0.0 and standard deviation 1.0 were selected. L 1 = L 2 = 0.05 and FOU = 0.30 were used in the fuzzification process according to experts, as they provide a fast response while at the same time reducing overshoots according to [18].…”
Section: Resultsmentioning
confidence: 99%
“…Considering a process whose mean is 0 and standard deviation is 1, 20 samples are randomly generated whose sample subgroups have a size of 5. Using the control limit equations for the traditional 𝑋 and R control charts, as can be seen in [18], we obtain: LCL = −1.477 and UCL = 1.480 for X ; and LCL = 0 and UCL = 5.417 for R. Table 6 shows the situation described, together with the X and R parameters. Thus, IT2TFN X and R control charts offer several overwhelming advantages over traditional X and R control charts.…”
Section: Illustrative Examplementioning
confidence: 99%
See 2 more Smart Citations