2019
DOI: 10.1155/2019/4036794
|View full text |Cite
|
Sign up to set email alerts
|

Analysis of the Effect of the Line‐Seru Conversion on the Waiting Time with Batch Arrival

Abstract: The conveyor assembly line has been widely used in manufacturing industries to produce standard products with low costs. However, due to lack of flexibility, this production method has not been conducive to multivariety and small-batch production. In this situation, seru production formed by converting conveyor assembly lines has been a successful innovation in the Japanese manufacturing industry. Most of the existing literature has studied the benefits of this line-seru conversion from the perspective of the … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
1
0
1

Year Published

2021
2021
2024
2024

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(5 citation statements)
references
References 24 publications
0
1
0
1
Order By: Relevance
“…Hence, the influence of learning curves on the skills should be explored. Gong et al (2009), Manupati et al (2015), Ren & Wang (2019) In Table A.1, "Relationship between employees" refers to the operator's ability to perform multiple tasks, which was already included.…”
Section: Discussionmentioning
confidence: 99%
See 2 more Smart Citations
“…Hence, the influence of learning curves on the skills should be explored. Gong et al (2009), Manupati et al (2015), Ren & Wang (2019) In Table A.1, "Relationship between employees" refers to the operator's ability to perform multiple tasks, which was already included.…”
Section: Discussionmentioning
confidence: 99%
“…Another study (Ren & Wang, 2019) pointed out the lack of studies from a customer's perspective. Subsequently, they proposed a method to determine the time of receiving products.…”
Section: Mathematical Models and Algorithmsmentioning
confidence: 99%
See 1 more Smart Citation
“…Önerdikleri model için NSGA-II sezgiseli kullanmışlardır. Ren ve Wang [23], çalışmalarında hat-seru tasarımı problemlerini tezgah ve istasyonlar arasındaki kuyruklarda ortalama bekleme açısından değerlendirmişlerdir. Pratik uygulamalardan yola çıkarak sisteme varışların Poisson süreçlerine uygun ve rassal olduğu varsayımları altında klasik montaj hattı ve dönüştürülen seru sistemleri için kuyruk teorisinden faydalanılarak ortalama bekleme zamanını veren formüller geliştirilmiştir.…”
Section: Li̇teratür Araştirmasi (Literature Review)unclassified
“…To minimize cost and maximize service level, Wang et al (2018) [46] studied the problem of seru formation under uncertain demand by establishing a multi-objective optimization model. Ren and Wang (2019) [34] took the change of average waiting queue length caused by seru formation as an evaluation index, and found that seru formation can reduce the average waiting queue length in multi-variety and small-batch production. Zhang et al (2020) [64] studied the seru formation problem of unbalanced SPS and designed an algorithm based on PSO to solve it.…”
Section: Introductionmentioning
confidence: 99%