Analysis of the Green Power Transition on Optimal Power Transformer Designs

Abstract: The main intent of the power transformer design optimization

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
15
0

Year Published

2016
2016
2020
2020

Publication Types

Select...
7
2

Relationship

4
5

Authors

Journals

citations
Cited by 20 publications
(15 citation statements)
references
References 9 publications
0
15
0
Order By: Relevance
“…The above mentioned four optimization methods have been compared regarding a three-phase, 80 MVA power transformer. For this comparison two different sets of capitalisation factors have been selected (k 1 , k 2 ) from [28]. Thereforethe value of the no-load loss capitalization is k 1 = 7000, the value of the load loss capitalization factor in €/kW k 2 = 1000 €/kW.…”
Section: Test Case Transformer Specificationmentioning
confidence: 99%
“…The above mentioned four optimization methods have been compared regarding a three-phase, 80 MVA power transformer. For this comparison two different sets of capitalisation factors have been selected (k 1 , k 2 ) from [28]. Thereforethe value of the no-load loss capitalization is k 1 = 7000, the value of the load loss capitalization factor in €/kW k 2 = 1000 €/kW.…”
Section: Test Case Transformer Specificationmentioning
confidence: 99%
“…It is important to consider not only the technical feasibility, but the economic aspects, as well. Generally, the total cost of ownership (TOC) is used as a goal function [4] to consider the lifetime costs of the transformer [2,[4][5][6][7][8].…”
Section: Introductionmentioning
confidence: 99%
“…Various diagnostic systems exist for transformers [9][10][11]. The developed diagnostic methods for transformers are divided into off-line and on-line methods [12,13].…”
Section: Introductionmentioning