Combined with a foundation pit in kunming, the paper use the finite-difference software flac3d to establish engineering model and carry on the numerical simulation to simulate the excavation on the initial engineering condition of the double-row piles retaining structure. Summarize the calculation results when change the distance of the pile-rows and the length of the piles to analyze the results differences and changing law. The conclusion has some practical value in engineering.