2018 7th International Conference on Advanced Materials and Computer Science (ICAMCS 2018) 2018
DOI: 10.23977/icamcs.2018.079
|View full text |Cite
|
Sign up to set email alerts
|

Analysis on the Quality Problems and Preventive Measures of Prefabricated Building Construction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 5 publications
0
1
0
Order By: Relevance
“…Literature review 2.1 PCs' quality issues Various quality issues have been reported in PCs' design, production, transportation and assembly processes; for example, the size of components could be inaccurate and lead to deviations in the position of a reserved hole (Li, 2020). In the construction of prefabricated joints, quality problems such as insufficient grouting and misalignment of the sleeves often occur (Duan and Li, 2019). Furthermore, the quality of PC involves more stakeholders than the conventional construction because of the dual production environments (the factory and site), more design work and prefabrication lead time, a longer error correction cycle and stricter requirements on dimensional accuracy (Luo et al, 2020a;Zhang and Yu, 2020).…”
Section: Introductionmentioning
confidence: 99%
“…Literature review 2.1 PCs' quality issues Various quality issues have been reported in PCs' design, production, transportation and assembly processes; for example, the size of components could be inaccurate and lead to deviations in the position of a reserved hole (Li, 2020). In the construction of prefabricated joints, quality problems such as insufficient grouting and misalignment of the sleeves often occur (Duan and Li, 2019). Furthermore, the quality of PC involves more stakeholders than the conventional construction because of the dual production environments (the factory and site), more design work and prefabrication lead time, a longer error correction cycle and stricter requirements on dimensional accuracy (Luo et al, 2020a;Zhang and Yu, 2020).…”
Section: Introductionmentioning
confidence: 99%