Analyzing the Empire State Building Project from the Perspective of Lean Delivery System—A Descriptive Case Study

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
9
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(9 citation statements)
references
References 3 publications
0
9
0
Order By: Relevance
“…Furthermore, the third phase is the lean supply phase, which consists of transforming the conceptual design to detailed engineering documents such as components fabrication and logistics of deliveries. The last phase is the lean assembly phase, which begins with the delivery of materials, tools, labor or other components to the project is finished and handed over to the client [38]. Under the umbrella of collaborative delivery methods also comes alliances and partnering in which project alliancing is a delivery method that allows the owner and other participants to work together as an integrated and collaborative team with faith and trust to manage risks jointly and share the project outcome in the end.…”
Section: Project Delivery Methodsmentioning
confidence: 99%
“…Furthermore, the third phase is the lean supply phase, which consists of transforming the conceptual design to detailed engineering documents such as components fabrication and logistics of deliveries. The last phase is the lean assembly phase, which begins with the delivery of materials, tools, labor or other components to the project is finished and handed over to the client [38]. Under the umbrella of collaborative delivery methods also comes alliances and partnering in which project alliancing is a delivery method that allows the owner and other participants to work together as an integrated and collaborative team with faith and trust to manage risks jointly and share the project outcome in the end.…”
Section: Project Delivery Methodsmentioning
confidence: 99%
“…Thus, the concept could have been available at the time of the ESB project, but appears to have been ignored or deemed unfit for the project. Instead, participants seemed to go with a form of Lean construction (Ghosh & Robson, 2015), or flow approach (Sacks & Partouche, 2010) although neither of these approaches appeared to have been invented at the time (Scherrer-Rathje et al, 2009).…”
Section: Understanding the Construction Of The Esbmentioning
confidence: 99%
“…Sacks and Partouche (2010) characterized the approach in terms of various flows. Ghosh and Robson (2015), on the other hand, discussed the project in terms of a Lean project delivery system. Either, or both, could be considered appropriate in terms of present thinking.…”
Section: Approachmentioning
confidence: 99%
“…It uses visual or other signals to detect and prevent errors in processes with the aim of achieving zero defects (Tommelein, 2008). Work Structuring -It is a fundamental form of planning which determines what work must be done, who would be best suited to execute it and when they should be doing it (Ghosh & Robson, 2015). Work Standardization-It is the extensive use of successful practices or procedures in a regular, repetitive manner (Alistair G.F. Gibb & Frank Isack, 2001).…”
Section: Figure 1 Little's Law Relationship Between Throughput (Th)mentioning
confidence: 99%
“…Supporting Evidence -Work structuring was implemented in the fast tracking of Empire State Building. Ghosh & Robson (2015) states that the work structuring applied to this project facilitated predictable workflow.…”
Section: Daily Huddle Meetingsmentioning
confidence: 99%