2009
DOI: 10.1016/j.neulab.2008.12.002
|View full text |Cite
|
Sign up to set email alerts
|

Anleitung zur Elektrodenplatzierung des internationalen 10–20-Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
4
0
1

Year Published

2012
2012
2023
2023

Publication Types

Select...
3
2
1

Relationship

1
5

Authors

Journals

citations
Cited by 6 publications
(5 citation statements)
references
References 2 publications
0
4
0
1
Order By: Relevance
“…Moreover, it is worth noting that operators are allowed to locate 10/20 landmarks in arbitrary sequence, since all of the 10/20 landmarks have already been identified in virtual space. For manual measurement, however, 10/20 landmarks must be measured in a sequence determined by the 10/20 rules (Jasper, 1958 ; Milnik, 2009 ). According to our experience, to manually measure Cz, i.e., the first landmark in the measurement sequence, the time cost is about 2 min.…”
Section: Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…Moreover, it is worth noting that operators are allowed to locate 10/20 landmarks in arbitrary sequence, since all of the 10/20 landmarks have already been identified in virtual space. For manual measurement, however, 10/20 landmarks must be measured in a sequence determined by the 10/20 rules (Jasper, 1958 ; Milnik, 2009 ). According to our experience, to manually measure Cz, i.e., the first landmark in the measurement sequence, the time cost is about 2 min.…”
Section: Discussionmentioning
confidence: 99%
“…According to Jasper, it takes four steps to complete the identification of all 21 landmark points in a one by one manner. Moreover, identification of 10–20 landmarks in later steps depends on the positions of 10/20 landmarks determined in prior steps (Jasper, 1958 ; Milnik, 2009 ). Such a tedious and error-prone procedure, involving both manual measurement and marking of 10/20 landmarks on the head of the subject, makes it difficult for the experimenter to maintain high reliability.…”
Section: Introductionmentioning
confidence: 99%
“…Gegebenenfalls werden die Elektroden an T1 und T2 ergänzt, bei einer Haube zumeist mit Klebeelektroden. Die Positionen werden wie folgt gefunden: Linie zwischen dem äußeren Gehörgang und dem lateralen Augenwinkel, vom Ohr 1/3 der Strecke in der Richtung auf das Auge und 1 cm aufwärts [8].…”
Section: Bestimmen Von Cz = Vertexunclassified
“…Moreover, this extensively used technique also faces some issues in terms of reliability and initial time cost, largely due to the manual landmark evaluation procedure on the surface of head [196]. So that, kind of a laborious and error-susceptible procedure (making manual landmark measurements on the subject's head), makes it very difficult for the researcher to maintain a high accuracy.…”
Section: Spatial Registrationmentioning
confidence: 99%