“…The objectives of this commissioning were to verify that the installation met the requirements and specifications of the project, to ensure the power installed and to estimate the expected losses. In 2007, when ISFOC started its operation, there was no official standard deployed to make the rating of a CPV plant, so ISFOC defined its own approach in the Call for Tenders [6,7,8]. It included a documental review, a visual inspection, an operation verification and the main two points: the determination of the peak power of the concentrators (CPV technology potential) and the estimation of the energy losses of the installation.…”