SPE Latin America and Caribbean Petroleum Engineering Conference 2014
DOI: 10.2118/169464-ms
|View full text |Cite
|
Sign up to set email alerts
|

Application of Assisted Optimization to Aid Oil Exploitation Strategy Selection for Offshore Fields

Abstract: Decision-making processes for selecting an oil exploitation strategy can be complex due to the high number of variables to be optimized. Many times, it can be unfeasible to search an optimal solution by evaluating a high quantity of variables simultaneously. In this case, assisted methods that involve engineering analyses and mathematical optimization algorithms are an alternative to obtain a good solution. This paper shows the application of an assisted method to optimize a large number of variables of an oil… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0
6

Year Published

2015
2015
2022
2022

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 21 publications
(10 citation statements)
references
References 21 publications
0
4
0
6
Order By: Relevance
“…Next, each RM is optimized by changing only the position of undrilled wells using the DECE algorithm from CMG's CMOST. This heuristic criterion simplifies the optimization process greatly increasing NPV with relatively little computational effort (Gaspar et al, 2014). After all RMs are optimized, nine new production strategies are obtained (PS1 n to …”
Section: Methodsmentioning
confidence: 99%
“…Next, each RM is optimized by changing only the position of undrilled wells using the DECE algorithm from CMG's CMOST. This heuristic criterion simplifies the optimization process greatly increasing NPV with relatively little computational effort (Gaspar et al, 2014). After all RMs are optimized, nine new production strategies are obtained (PS1 n to …”
Section: Methodsmentioning
confidence: 99%
“…The first production strategy is selected using an optimization procedure (Gaspar et al, 2014(Gaspar et al, , 2016aRavagnani et al, 2011;von Hohendorff Filho et al, 2016). 7.…”
Section: Blue Stepsmentioning
confidence: 99%
“…In order to optimize the Base1 production strategy, it was considered as optimization parameters the decision (G1) and operation (G2) variables related to UNISIM-I-D definition (Gaspar et al, 2014). The G1 variables were: number, type (vertical or horizontal), location and schedule of wells and capacities constraints (liquid, oil and water production and water injection) of platform.…”
Section: Figure 3-water Production For the 4 Initial Wells With Histomentioning
confidence: 99%