2012
DOI: 10.4028/www.scientific.net/amm.170-173.3141
|View full text |Cite
|
Sign up to set email alerts
|

Application of Formwork Technology in Engineering

Abstract: Installing and dismantling the formwork are not easy in cast-in-situ multi-ribbed slab construction,the formwork technology overcomes the difficult problem.This paper mainly introduces the construction technology and quality standards of the plastic formwork.Through the engineering practice,the author sums up the advantages of this technology.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2014
2014
2023
2023

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…Therefore, compared with cast-in-place buildings, prefabricated buildings pay more attention to the cooperation of various specialties in the design stage and the participants' coordination at all stages of the project. Based on the prefabricated component library, BIM models of architecture, structure, water, heating, electricity and other professions are established, the design of the above professions is made and then the model is built [5] . On this basis, the collaborative design of pipeline collision, opening reservation and other disciplines is carried out to reduce the delay of the construction period and increase of cost caused by rework.…”
Section: Bim Model and Collaborative Designmentioning
confidence: 99%
“…Therefore, compared with cast-in-place buildings, prefabricated buildings pay more attention to the cooperation of various specialties in the design stage and the participants' coordination at all stages of the project. Based on the prefabricated component library, BIM models of architecture, structure, water, heating, electricity and other professions are established, the design of the above professions is made and then the model is built [5] . On this basis, the collaborative design of pipeline collision, opening reservation and other disciplines is carried out to reduce the delay of the construction period and increase of cost caused by rework.…”
Section: Bim Model and Collaborative Designmentioning
confidence: 99%
“…As a forming mold for pouring concrete components, building formwork has a considerable demand in the fields of on site concrete pouring and prefabricated concrete components. In concrete structure projects, formwork construction accounts for more than 30% of the whole cost, about 50% of the constructing labor, and about 50% of the construction period, which has huge influence on the cost, quality and benefit of the construction project directly [1]. The development of new formwork can not only obtain excellent social benefits of protecting resources and the environment, but also can save construction costs and have better economic benefits.…”
Section: Introductionmentioning
confidence: 99%