Application of Last Planner System to Modular Offshore Wind Construction

Abstract: Authors may post the final draft of their work on open, unrestricted Internet sites or deposit it in an institutional repository when the draft contains a link to the published version at www.ascelibrary.org. "Final draft" means the version submitted to ASCE after peer review and prior to copyediting or other ASCE production activities; it does not include the copyedited version, the page proof, a PDF, or full-text HTML of the published version.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0
2

Year Published

2020
2020
2024
2024

Publication Types

Select...
8
2

Relationship

2
8

Authors

Journals

citations
Cited by 23 publications
(7 citation statements)
references
References 69 publications
0
5
0
2
Order By: Relevance
“…Value Stream Mapping (VSM) proves the possibility of achieving modular construction timelines with integration to BIM platforms at all organizational levels (Barkokebas et al, 2021). Schedule risks were successfully handled with the Last Planner System (LPS) applied in a modular offshore wind construction (Lerche et al, 2020). Just in Time, a lean tool was adapted to form a component delivery framework hindering scheduling risks (Si et al, 2021).…”
Section: Adopting Lean Methodsmentioning
confidence: 99%
“…Value Stream Mapping (VSM) proves the possibility of achieving modular construction timelines with integration to BIM platforms at all organizational levels (Barkokebas et al, 2021). Schedule risks were successfully handled with the Last Planner System (LPS) applied in a modular offshore wind construction (Lerche et al, 2020). Just in Time, a lean tool was adapted to form a component delivery framework hindering scheduling risks (Si et al, 2021).…”
Section: Adopting Lean Methodsmentioning
confidence: 99%
“…Na Bélgica, a aplicabilidade do Last Planner System (LPS), no âmbito da construção eólica modular, foi avaliada num estudo conduzido por Lerche et al (2020). A pesquisa fez uso do método Design Science Research.…”
Section: Gestão De Custos Planejamento E Processos Produtivos Na Cons...unclassified
“…One of the first lean construction tools was the Last Planner System™ (LPS) (Ballard 2000) which has proven its ability to improve planning effectiveness, e.g., Alarcón et al (2005); AlSehaimi et al (2009); Ballard (2000); Lerche et al (2020a). Later, the lean construction tool Location-Based Scheduling (LBS) emerged (Kenley and Seppänen 2010) and proved its ability to compress construction schedules (Evinger et al 2013;Lerche et al 2019a;Lerche et al 2019b;Seppänen et al 2014).…”
Section: Background: Labour Efficiency and Lean In Constructionmentioning
confidence: 99%