This paper presents the determination of insulation coordination for phase-to-ground switching over voltages by a practical method in which the effect of the switching overvoltage waveshape, especially the impact of the time to crest on insulation strength is considered. This work is carried out on the world’s first 1200 kV transmission line by modelling it in PSCAD.