2017
DOI: 10.1515/amsc-2017-0018
|View full text |Cite
|
Sign up to set email alerts
|

Application of Quality Management Tools for Evaluating the Failure Frequency of Cutter-Loader and Plough Mining Systems

Abstract: Failure frequency in the mining process, with a focus on the mining machine, has been presented and illustrated by the example of two coal-mines. Two mining systems have been subjected to analysis: a cutter-loader and a plough system. In order to reduce costs generated by failures, maintenance teams should regularly make sure that the machines are used and operated in a rational and effective way. Such activities will allow downtimes to be reduced, and, in consequence, will increase the effectiveness of a mini… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
14
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 14 publications
(14 citation statements)
references
References 2 publications
0
14
0
Order By: Relevance
“…The machine is also an assembly of individual machines connected together in such a way as to operate as a whole. The useful operation of machines is usually reflected in the processing of matter carried out in the working system of the machine (Biały, 2017). The way the machine operates and the machine control systems should be adapted to the operator.…”
Section: Machine Systems In Miningmentioning
confidence: 99%
See 2 more Smart Citations
“…The machine is also an assembly of individual machines connected together in such a way as to operate as a whole. The useful operation of machines is usually reflected in the processing of matter carried out in the working system of the machine (Biały, 2017). The way the machine operates and the machine control systems should be adapted to the operator.…”
Section: Machine Systems In Miningmentioning
confidence: 99%
“…The classification of factors affecting the use of nominal working time can be presented in the form of a flow chart (Figure 1). Taking into account the factors affecting the use of nominal working time of technical measures, it can be noted that this time is significantly influenced by ( Figure 1) (Biały, 2013;Biały, 2014;Biały, 2017):…”
Section: Longwall Reinforcement Processmentioning
confidence: 99%
See 1 more Smart Citation
“…Currently, it is also necessary to take into account factors related to ecology or time. Problems at the operational level relate to the current organization of physical flows in order to minimize costs, ensure proper warehouse management, a more favorable means of transporting goods and achieving a high degree of readiness to fulfill orders (Biały, W. 2017). Purchases and supplies are responsible for the effective implementation of the flow of supply goods from their suppliers to customers.…”
Section: Introductionmentioning
confidence: 99%
“…From the last screen upper product is directed to pre-classification node, while bottom products of both screens can be already routed alternatively, for loading into wagons, piles or to heat and power plant (Biały, 2017). The upper product of the PZ 3090 screening machine, the grain class + 16 mm, is enriched with a two-product heavy-duty enrichment fluid type Drewboy 3.2.…”
Section: Introductionmentioning
confidence: 99%