“…The systems engineering analysis for an integrated safety management system paralleled the functions for the ISMS. The ISMS had the functional flow of: • Develop the answer that will perform the functions and satisfy the requirements • Test and iterate on the design to further enhance functionality and performance This engineering analysis used the FRAT methodology of Mar and Morais (Mar, 1994, Morais and Grygiel, 1994, Mar and Morais, 1997 to develop a definition for an integrated system. The methodology defined the top level function (F), Do Work Safely, the requirements (R), Meet The Orders and Regulations and Meet The Work Task Needs), the answer (A), Facility Integrated Management System, and the test (T), Approval by Management.…”