Application of Takt and Kanban to Modular Wind Turbine Construction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
11
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 13 publications
(11 citation statements)
references
References 77 publications
0
11
0
Order By: Relevance
“…Takt-time planning is carried out by first determining preliminary Takt and planning the work zones, then optimizing labor, space, and duration assignments to enhance a smooth flow of workers entering and leaving a workspace at a fixed time interval (Takt), one crew at a time. The uniqueness of Takt-time planning is that it assigns only one crew to work in a specific space within a Takt, minimizing the chance of overcrowding or work waiting for workers to protect productivity [12,13]. The Takt-time planning method ensures continuity and stability in the execution of work and defines clear handoffs between operators to facilitate coordination and control [14,15].…”
Section: Literature Review 21 Takt-time Planning Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…Takt-time planning is carried out by first determining preliminary Takt and planning the work zones, then optimizing labor, space, and duration assignments to enhance a smooth flow of workers entering and leaving a workspace at a fixed time interval (Takt), one crew at a time. The uniqueness of Takt-time planning is that it assigns only one crew to work in a specific space within a Takt, minimizing the chance of overcrowding or work waiting for workers to protect productivity [12,13]. The Takt-time planning method ensures continuity and stability in the execution of work and defines clear handoffs between operators to facilitate coordination and control [14,15].…”
Section: Literature Review 21 Takt-time Planning Methodsmentioning
confidence: 99%
“…Lerche et al applied Takt-time scheduling to the assembly of six towers in an offshore project, and the intervention reduced the time per tower module by nine days and the loading interval by 3.6 days, which reduced wastage and uncertainty in the construction schedule [13]. Kimmo et al applied Takt-time scheduling to a project of about 200 units of a refurbished apartment building, and the rationalization of the Takt-time and the division of areas allowed the building to be delivered on time, and pointed out that Takt production must be planned [16].…”
Section: Literature Review 21 Takt-time Planning Methodsmentioning
confidence: 99%
“…Other studies adopted cross process simulations to integrate information of different processes to optimise total time and cost (Heravi et al 2021), carbon emissions (Heravi et al 2020), and digitalisation efficiency (Barkokebas et al 2021a). Further, takt planning is employed to synchronise production information necessary to smooth resource utilisation (Chauhan et al 2018), and reduce delays (Lerche et al 2022). Other studies adopted Design for Manufacture and Assembly (DfMA) principles to synchronise design information with manufacturing and assembly processes to verify design geometry prior to production (He et al 2021), and improve site safety and logistics efficiency (Banks et al 2018).…”
Section: Interoperabilitymentioning
confidence: 99%
“…Real-time production monitoring systems facilitate proactive detection of process waste and so stimulate timely mitigating decisions (Snatkin et al 2013). Other studies used the lean concept of takt planning to synchronise production rhythm with actual market demand, reporting several benefits including resource optimisation (Chauhan et al 2018) and productivity improvements (Lerche et al 2022). For logistics tracking & control, component level data (e.g., location and class) are synchronised in real-time using module tracking technologies, such as RFID and IoT to optimise logistics cost and efficiency (Wang et al 2020a), and support on-time deliveries (Xu et al 2018).…”
Section: Real-time Capabilitymentioning
confidence: 99%
“…The thematic has already been so explored and revised over time. Nevertheless, the PDCA cycle remains the preferred one: it is simple, it is founded in four basilar stages, according to the Kaizen perspective, and it is a proven effective approach for CI -see recent work of Franco-Quispe et al ( 2022), Ghatorha et al (2022) and Lerche et al (2022). For the mentioned reasons, the PDCA cycle is the chosen methodology for what follows.…”
Section: Problem-solving Methodologies and Nature Of Usementioning
confidence: 99%