Application of the holistic observation method on shield tunnel drives as a means of preventing disputes and conflict reduction in case of interruptions / Anwendung der ganzheitlichen Beobachtungsmethode bei Schildvortrieben als Mittel zur präventiven Streitvermeidung und Konfliktreduzierung bei Störsituationen

Abstract: The consistent application of the observation method on shield tunnel drives can make a considerable contribution to preventative dispute avoidance and conflict reduction when issues occur. The observation method should include not only the monitoring and analysis of mechanical process data such as machine data, control parameters and data from the geotechnical instrumentation but also process control as the tunnel advances, which is documented in the following quality assurance documents: explanatory report, … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
1
0
2

Year Published

2016
2016
2018
2018

Publication Types

Select...
1
1

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 2 publications
0
1
0
2
Order By: Relevance
“…Der Schwerpunkt liegt auf einem externen, sich in den letzten Jahren stetig weiterentwickelnden Prozesscontrolling als Überwachungselement der Ausführungsphase, da dies einen zentralen Bestandteil der auftraggeberseitigen Kontrollfunktion darstellt. In the next section, the building blocks of quality assurance [3] [5] are explained in more detail. Then aspects of process controlling are explained regarding implementation and gaining of experience.…”
Section: Quality Assurance and Risk Management Strategyunclassified
See 2 more Smart Citations
“…Der Schwerpunkt liegt auf einem externen, sich in den letzten Jahren stetig weiterentwickelnden Prozesscontrolling als Überwachungselement der Ausführungsphase, da dies einen zentralen Bestandteil der auftraggeberseitigen Kontrollfunktion darstellt. In the next section, the building blocks of quality assurance [3] [5] are explained in more detail. Then aspects of process controlling are explained regarding implementation and gaining of experience.…”
Section: Quality Assurance and Risk Management Strategyunclassified
“…In particular the assignment of incidents in the risk sphere ground/machinery at the interface of the responsibilities of client and contractor can be considerably simplified by continuous data monitoring and analysis, and thus a prompt reaction to incident situations on the drive can be beneficial. Planned-actual comparisons of the system behaviour and the rock mass quality can also be performed using the recorded data as well as analyses and continuous updating of the forecasts of the geological-geotechnical model (deformation behaviour, parameters) and the structural safety can be investigated using the observation method approach according to EC7 [3].…”
Section: Prozessdatenanalyse Als Qualitätssicherungselement In Der Aumentioning
confidence: 99%
See 1 more Smart Citation