IEEE PES Innovative Smart Grid Technologies 2012
DOI: 10.1109/isgt-asia.2012.6303104
|View full text |Cite
|
Sign up to set email alerts
|

Application of the Time-varying Outage Model of electric transmission and transformation equipment in Condition-based Maintenance

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2015
2015
2024
2024

Publication Types

Select...
2
2

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 23 publications
0
2
0
Order By: Relevance
“…The Logistic equation [10] shown in equation ( 17), which is widely used at present, is used to construct a chaotic sequence to enhance the algorithm's capability for global optimization.…”
Section: Improvement Strategymentioning
confidence: 99%
“…The Logistic equation [10] shown in equation ( 17), which is widely used at present, is used to construct a chaotic sequence to enhance the algorithm's capability for global optimization.…”
Section: Improvement Strategymentioning
confidence: 99%
“…erefore, their normal and continuous service is vital [4]. In the long-term use of transformer equipment, there are inevitable ageing and failure hidden dangers [5]. Moreover, the cost of a power transformer is high, so it is necessary to diagnose the state of the transformer and take effective measures to fix faults that will occur to ensure the reliable operation of the transformer and reduce the occurrence of faults [6].…”
Section: Introductionmentioning
confidence: 99%