2017
DOI: 10.9711/ktaj.2017.19.2.335
|View full text |Cite
|
Sign up to set email alerts
|

Application technique on thrust jacking pressure of shield TBM in the sharp curved tunnel alignment by model tests

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
4
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…Kang et al [7] undertook a numerical simulation to evaluate the structural stability of the TBM shield during a tightly curved excavation, identifying the load transfer mechanism from articulation and shield jacks to the shield skin and the effect of load transfer on the structural stability of the shield skin.…”
Section: Introductionmentioning
confidence: 99%
See 3 more Smart Citations
“…Kang et al [7] undertook a numerical simulation to evaluate the structural stability of the TBM shield during a tightly curved excavation, identifying the load transfer mechanism from articulation and shield jacks to the shield skin and the effect of load transfer on the structural stability of the shield skin.…”
Section: Introductionmentioning
confidence: 99%
“…However, the navigation system was considered in two-dimensional space. Further studies have also aided the understanding of the overall TBM steering system [7][8][9].…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations