Supply Chain Management on Demand
DOI: 10.1007/3-540-27354-9_5
|View full text |Cite
|
Sign up to set email alerts
|

Applications of Implosion in Manufacturing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
5
0

Publication Types

Select...
4
2
1

Relationship

2
5

Authors

Journals

citations
Cited by 9 publications
(5 citation statements)
references
References 12 publications
0
5
0
Order By: Relevance
“…The ATP process utilizes an analytical technique called implosion to generate an optimized ATP schedule that takes into account supplier commitments and limited manufacturing capacities (e.g., Dietrich et al 2005). Because the implosion technology has no means of dealing with unallocated supply, a separate non-integrated business process is often created to manage inventory excess and overages, e.g.…”
Section: Ervolina Ettl Lee and Petersmentioning
confidence: 99%
See 1 more Smart Citation
“…The ATP process utilizes an analytical technique called implosion to generate an optimized ATP schedule that takes into account supplier commitments and limited manufacturing capacities (e.g., Dietrich et al 2005). Because the implosion technology has no means of dealing with unallocated supply, a separate non-integrated business process is often created to manage inventory excess and overages, e.g.…”
Section: Ervolina Ettl Lee and Petersmentioning
confidence: 99%
“…Chen-Ritzo (2006) studies the availability management process for CTO system with order configuration uncertainty and formulates a two stage stochastic linear program with recourse that is solved using a sample average approximation method. Dietrich et al (2005) describe an Available-To-Sell (ATS) implosion model that finds marketable products that consume the excess while minimizing additional component purchasing costs. Akcay and Xu (2004) develop a two-stage stochastic integer program with recourse to allocate constrained components so as to maximize the fraction of orders assembled within a quoted maximum delay.…”
Section: Introductionmentioning
confidence: 99%
“…In industries, the capability for constrained planning has been incorporated in some of the advanced supply chain solutions. For example, the IBM Implosion Technology described in Dietrich et al (2005) is capable of solving a variety of complex manufacturing planning problems including those with materials and capacity constraints in a deterministic setting. Particularly, the heuristic-based planning engine based on the implosion technology has the capability of optimizing capacity utilization by allowing sub-assemblies to be built early.…”
Section: Literature Reviewmentioning
confidence: 99%
“…In the manufacturing supply chain, this might be a set of components that are produced by a certain manufacturing step, which itself consumes some set of parts and capacities. RCP is built using the Watson Implosion Technology (WIT) toolkit [5,6], which consists of a resource capacity model, solvers, and an Application Programming Interface (API). This paper describes the kinds of problems that RCP addresses and discusses how some of the unique attributes of the human resource supply chain were incorporated into the RCP models.…”
Section: Introductionmentioning
confidence: 99%