Aproximación teórico-práctica al concepto de Valor Ganado en la gestión de proyectos

Abstract: El éxito de un proyecto está relacionado directamente con los niveles de similitud entre la planeación y los resultados; es decir, que la ejecución sea una radiografía de lo preconcebido. Para dicho cometido es indispensable contar con un sistema de seguimiento y control que refleje oportunamente las realidades del proyecto, amén de permitir la generación de intervenciones oportunas, ya sean de tipo preventivo o correctivo. En tal sentido, el presente manuscrito, fruto de una revisión documental, presenta la t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 7 publications
0
2
0
Order By: Relevance
“…This tracking is best done using earned value management. The concept of earned value is associated with the measurement of the work (scope) performed at the proposed cost, and when it is combined with the joint measurement at the baseline (scope, schedule, and cost), it is referred to as earned value management (EVM) [ 107 ].…”
Section: Resultsmentioning
confidence: 99%
“…This tracking is best done using earned value management. The concept of earned value is associated with the measurement of the work (scope) performed at the proposed cost, and when it is combined with the joint measurement at the baseline (scope, schedule, and cost), it is referred to as earned value management (EVM) [ 107 ].…”
Section: Resultsmentioning
confidence: 99%
“…Earned value management is the method of choice for this monitoring. The concept of earned value is associated with the measurement of the work (scope) performed at the proposed cost, and when it is combined with the joint measurement at the baseline (scope, schedule and cost), it is referred to as earned value management (EVM) [1].…”
Section: Introductionmentioning
confidence: 99%