2008 IEEE Industry Applications Society Annual Meeting 2008
DOI: 10.1109/08ias.2008.372
|View full text |Cite
|
Sign up to set email alerts
|

Architecture of Electrical Installations: The Node Double Two

Abstract: The architecture of a power system can be configured in increasing complexity related to its exigencies, taking actions on the sources and on the configuration. In the failure cases, it has to guarantee availability and integrity, the time to repair the components has to be compatible to avoid the loss service continuity. The paper relates on the special configuration of the node "double two", constituted by two, and so more, automatic transfer systems connectible in parallel, and reports on the validation tes… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
6
0

Year Published

2011
2011
2019
2019

Publication Types

Select...
5
3

Relationship

4
4

Authors

Journals

citations
Cited by 10 publications
(6 citation statements)
references
References 5 publications
0
6
0
Order By: Relevance
“…In electrical power systems, an automatic transfer system, like a traffic light, is used to avoid sources being connected if a parallel connection is not admissible (m = 1) [10], [12], [13].…”
Section: Road Traffic Analogy: the Genetic Code For The Rulesmentioning
confidence: 99%
“…In electrical power systems, an automatic transfer system, like a traffic light, is used to avoid sources being connected if a parallel connection is not admissible (m = 1) [10], [12], [13].…”
Section: Road Traffic Analogy: the Genetic Code For The Rulesmentioning
confidence: 99%
“…Each UPS supplies a general SWB that, in the data center architecture assumed as reference (Fig. 1) [11], [12], consists of a main section and more derived independent S sections on which periodic maintenances without loss service continuity are allowed because of the dual-corded equipment. The SWB design needs to plan the load balancing and the future expansion and rehabilitation of the distribution (road map).…”
Section: Distribution Maintainability and Load Balancingmentioning
confidence: 99%
“…Figs. 7 and 8 show the special configuration of the node "double two" of two automatic transfer switches connectible in parallel [19], at the same distribution level, constituted by two circuit breakers with automatic controllers and interlocks. Fig.…”
Section: Node 22 Double Two [19]mentioning
confidence: 99%
“…The operation on the node requires adopting integrity procedures using manual operations and/or programmable logic controllers and/or electromechanical releases, as suggested in this paper. To close and operate tie switch T in the closed status, three components must operate correctly [19]: a tie shutter TS to authorize the closing of the tie if it is in a compatible status, a synchronizer SY of the automation supply of the ATS, and a tie conditioner TCD to control the operation in the closed status. The applicable instructions can be related to the binary logic connectives/gates (like NAND, NOR, XOR, and AND) adopting Boolean notations.…”
Section: Node 22 Double Two [19]mentioning
confidence: 99%
See 1 more Smart Citation