2020
DOI: 10.24425/aee.2020.133031
|View full text |Cite
|
Sign up to set email alerts
|

Archives of Electrical Engineering

Łukasz Tomków,
Maciej Cholewiński,
Marian Ciszek
et al.

Abstract: Sections of the superconducting magnets of the SIS100 particle accelerator, under construction at the Facility for Antiproton and Ion Research (FAIR), the Society for Heavy Ion Research (GSI), Darmstadt, are going to be connected with the by-pass lines. Each line will be used to transfer a two-phase helium flow and an electric current. The electric current will be carried by four pairs of superconducting Nuclotron-type cables. Fast-ramping currents are expected to cause the generation of heat within the cables… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2020
2020
2021
2021

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 17 publications
0
0
0
Order By: Relevance