Assembly Line - Theory and Practice 2011
DOI: 10.5772/19953
|View full text |Cite
|
Sign up to set email alerts
|

Assembly Line Balancing and Sequencing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2017
2017
2020
2020

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 11 publications
0
2
0
Order By: Relevance
“…In this study, the former is the case because the plant parameters are certain (known) and measurable. One of the key factors and performance indicators for the design and balancing of a production line is cycle time [8]. The corollary of this preceding statement is that prudent or otherwise use of cycle time affects line efficiency and ultimately loads flow.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…In this study, the former is the case because the plant parameters are certain (known) and measurable. One of the key factors and performance indicators for the design and balancing of a production line is cycle time [8]. The corollary of this preceding statement is that prudent or otherwise use of cycle time affects line efficiency and ultimately loads flow.…”
Section: Introductionmentioning
confidence: 99%
“…For brevity, the consulted relevant literature is further discussed in tabular format, Table 1, after classification according to keywords of the title. Article cited [1], [4], [21] [9], [11], [14], [17], [20] [6], [7], [8], [10], [12], [14], [15], [23] [13], [22], [24], [25], [26] [16], [17] Problem purpose…”
Section: Introductionmentioning
confidence: 99%