“…As an example, a valid feasible assembly sequences (seq), seq 1 [1,2,6,8,3,4,7,5,9] as in Figure 3 and two other sequence seq 2 [1,5,3,4,7,2,6,8,9] and seq 3 [1,3,4,7,2,6,8,5,9] are considered. For given, cycle time maximum for this assembly line is to be 10.…”