2024
DOI: 10.1016/j.undsp.2023.05.012
|View full text |Cite
|
Sign up to set email alerts
|

Assessing clogging potential and optimizing driving parameter of slurry shield tunneling in clay stratum assisted with CFD-DEM modeling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
4
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(4 citation statements)
references
References 40 publications
0
4
0
Order By: Relevance
“…In addition, the comparative analysis of the three pile lengths shows that the horizontal displacement value and the distribution of the horizontal displacement of the three pile lengths are basically the same near the buried depth of the tunnel [ 30 ]. However, the horizontal displacement at the top of pile shows greater difference with the increase of the distance between tunnel and pile foundation.…”
Section: Resultsmentioning
confidence: 99%
See 2 more Smart Citations
“…In addition, the comparative analysis of the three pile lengths shows that the horizontal displacement value and the distribution of the horizontal displacement of the three pile lengths are basically the same near the buried depth of the tunnel [ 30 ]. However, the horizontal displacement at the top of pile shows greater difference with the increase of the distance between tunnel and pile foundation.…”
Section: Resultsmentioning
confidence: 99%
“…Short piles (pile length H) are mainly characterized by inclination of the pile base and therefore axial stresses are low. a comparative analysis of Fig 11(B) to 11(C) also shows that as the distance between pile foundation and tunnel increases, the axial stress difference on both sides of pile foundation also gradually decreases, which also indicates that the influence of tunnel construction on pile foundation is gradually decreasing [ 30 ].…”
Section: Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…The motion behavior of gangue slurry in the pipeline results from the interaction between gangue particles and slurry [14,21,22]. The coupled CFD-DEM method is used to solve the interaction between particles and fluid [23][24][25][26][27][28], which is very suitable for simulating the flow process of gangue slurry in the pipeline [13,19]. The CFD-DEM method has been utilized in various applications involving the coupling of fluids and solids in geotechnical engineering [29,30].…”
Section: Introductionmentioning
confidence: 99%