2006
DOI: 10.1016/j.jhydrol.2006.02.017
|View full text |Cite
|
Sign up to set email alerts
|

Assessing the importance of conduit geometry and physical parameters in karst systems using the storm water management model (SWMM)

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
79
0
1

Year Published

2007
2007
2020
2020

Publication Types

Select...
7
2
1

Relationship

1
9

Authors

Journals

citations
Cited by 131 publications
(81 citation statements)
references
References 26 publications
1
79
0
1
Order By: Relevance
“…The accuracy of prediction is acceptable at a MARE b 0.1% (Peterson and Wicks, 2006;Hu et al, 2009). RMSE is calculated as: where P i and p i are the predicted and measured values, respectively.…”
Section: Estimation Of the Spatial Mean Swcmentioning
confidence: 99%
“…The accuracy of prediction is acceptable at a MARE b 0.1% (Peterson and Wicks, 2006;Hu et al, 2009). RMSE is calculated as: where P i and p i are the predicted and measured values, respectively.…”
Section: Estimation Of the Spatial Mean Swcmentioning
confidence: 99%
“…It is widely used throughout the world for planning, analysis and design related to storm water runoff, combined sewers, sanitary sewers, and other drainage systems in urban areas, with many applications in non-urban areas as well [6,[46][47][48][49][50][51]. …”
Section: Hydrodynamic Simulationsmentioning
confidence: 99%
“…Wartości parametrów obiektów przyjęto na podstawie danych ustalonych dla fizycznie mierzalnych charakterystyk lub wartości zalecanych w podręczniku modelu (Rossman, 2010), jak również w innej literaturze (Peterson i Wicks, 2006;Park, Lee, Park i Ha, 2008). Charakterystyki i wymiary obiektów zlokalizowanych na obszarze portu lotniczego, takich jak przewodów sieci kanalizacyjnej i zbiorników, przyjęto zgodnie z danymi technicznymi uzyskanymi z dokumentacji projektowej i powykonawczej systemu odwodnienia lotniska.…”
Section: Model Zlewni Badawczejunclassified