2021
DOI: 10.1016/j.anucene.2020.107915
|View full text |Cite
|
Sign up to set email alerts
|

Assessment of management measures on station blackout accident in Unit-1 Bushehr nuclear power plant

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 9 publications
0
1
0
Order By: Relevance
“…Kang and Chang 10 performed the safety assessment of OPR‐1000 nuclear power plant for a station blackout accident by applying the combined deterministic and probabilistic procedure. Vahman et al 11 analyzed the station blackout accident and the effects of management measures on the behaviors of the Bushehr Nuclear Power Plant parameters under station blackout with consideration of three scenarios by using the RELAP5 code. Tian et al 12 developed a thermohydraulic and safety analytical code‐TSACC by using Fortran90 language to evaluate the transient thermohydraulic behavior of the China advanced research reactor under a station blackout accident.…”
Section: Introductionmentioning
confidence: 99%
“…Kang and Chang 10 performed the safety assessment of OPR‐1000 nuclear power plant for a station blackout accident by applying the combined deterministic and probabilistic procedure. Vahman et al 11 analyzed the station blackout accident and the effects of management measures on the behaviors of the Bushehr Nuclear Power Plant parameters under station blackout with consideration of three scenarios by using the RELAP5 code. Tian et al 12 developed a thermohydraulic and safety analytical code‐TSACC by using Fortran90 language to evaluate the transient thermohydraulic behavior of the China advanced research reactor under a station blackout accident.…”
Section: Introductionmentioning
confidence: 99%